Bills of materials (BOMs) are the linchpin of the entire process flow; nothing operates without BOMs! From production planning and material procurement to cost calculation, quality control, and traceability, the success of these processes hinges crucially on the high-quality nature of the BOMs.
Even in Eplan, generating a BOM from a project is not excessively cumbersome – it’s logical, and it has to be!
However, what if I only want to evaluate a few parts of the entire project, specific structures, a few installation locations, or particular equipment components, yet still present them in a ‘summarized BOM’? This can pose a challenge.
IS THIS NECESSARY?
In the video, I’ll demonstrate how to efficiently and flexibly create freely configurable itemized bills of materials.